Commercial solar

Make the roof earn its keep.

Solar for offices, retail, warehouses and farms. We start with your half-hourly or monthly consumption, tariffs and the way the building is used, then size the system around that.

What we review

Three questions before any equipment.

01

Operating profile

Working hours, seasonal changes, weekend load and the processes that cannot be interrupted. The shape of the day matters more than the monthly total.

02

Roof and structure

Usable area, orientation, shading, roof covering, structural capacity, access and any tenancy constraints on the building.

03

Connection and compliance

Existing electrical infrastructure, available capacity, metering, approval requirements and who is responsible for each step.

The proposal

Numbers you can take to a board.

A commercial solar decision usually needs more than a payback figure. We set out the assumptions so the numbers can be checked.

Discuss a commercial project

Load profile

Consumption history, demand peaks, tariff structure and the share of load that solar can realistically serve.

Generation estimate

Monthly yield based on the array size, orientation, tilt and local weather data, with the assumptions stated.

Financial model

Capital cost, expected savings, maintenance allowance and the effect of changing tariffs or usage.

Layout and equipment

Array layout, inverter selection, string design and the bill of quantities.

Approvals and phasing

Connection applications, structural sign-off where needed, and how installation avoids disrupting operations.

Exclusions and responsibilities

What the client, the installer and any third parties are responsible for, in writing.

How a project runs

From brief to commissioning.

01

Brief and bills

Share the site address, recent utility bills and any constraints on timing or access. We identify what additional information is needed.

02

Site and design

A site visit confirms roof condition, electrical capacity and routing. The design and proposal follow, with assumptions stated.

03

Install and commission

Installation is phased around operations where required. Testing, documentation and monitoring handover complete the project.

Larger or higher-voltage sites are handled under industrial solar. Hot water for staff facilities or kitchens: solar water heating.

Commercial solar

Start with the bills and the building.

Send a recent utility bill and the site address. We will tell you what can be assessed from them and what needs a site visit.