Demand and load shape
Maximum demand, load factor, shift patterns and the proportion of load that runs in daylight. Solar has to fit the curve, not the other way around.
Industrial solar
Larger arrays for factories, cold storage, mining and agricultural sites. Demand, power quality, critical processes and shutdown windows shape the design.
Project constraints
Maximum demand, load factor, shift patterns and the proportion of load that runs in daylight. Solar has to fit the curve, not the other way around.
Transformer capacity, protection settings, power factor, harmonics and the physical route for cabling and equipment.
Shutdown windows, crane and access requirements, phased commissioning and how the site keeps operating during installation.
Site assessment
An industrial project usually needs more than a roof measurement. The assessment establishes the technical basis for the design and the approvals that follow.
At least 12 months of consumption and demand data, or half-hourly records where available.
Existing distribution, transformer ratings, protection and the point of connection.
Usable area, structural capacity, waterproofing, shading and the mounting approach.
Power factor, harmonics and voltage conditions that could affect inverter operation.
Utility connection requirements, structural sign-off and any environmental or municipal permissions.
Shutdown windows, access, safety files, inductions and the sequence of commissioning.
Scale
Not every commercial roof needs an industrial process. If the building is simpler, the commercial solar approach is the better starting point.
Large roof areas with daytime load and high demand charges are usually the strongest candidates.
Refrigeration and irrigation run through the day, which can align well with solar generation.
Metering arrangements, landlord consent and how savings are shared need to be settled early.
Industrial solar
With metering data and the existing electrical layout we can tell you what is technically feasible before a site visit.